CDW Systems announces reduced three-week lead time on Dualframe windows
Posted on 17/11/2023
CDW Systems has announced a reduced lead time of three weeks on “house” colour Dualframe aluminium casement windows.
The specialist aluminium fabricator manufactures the Technal Dualframe and the Dualframe SI, so installers looking to get the top-tier aluminium windows can now get them faster.
Combining strength, safety, sustainability and sleek design, Dualframe 75 aluminium windows are renowned for their exceptional quality and performance. They offer excellent thermal insulation, security, and durability, making them a perfect choice for both residential and commercial applications.
Customers can also choose from a wide range of standard colour options and finishes to match their specific design preferences and project requirements and CDW has reduced the lead time to four weeks on these making them even more accessible to customers.
Jeremy Phillips, Group Chairman of CDW Systems said: “Our customers are at the heart of everything we do, and we are delighted to be able to offer this reduced three-week lead time on our white and anthracite grey house colour Dualframe windows. For other colours the lead time is reduced to four weeks.
“Our commitment to delivering products faster without compromising on quality, ensures that customers can now enjoy the benefits of these premium windows within just three weeks to help them complete their projects more efficiently.”
CDW Systems' experienced team is always available to provide expert guidance and support, helping customers choose the perfect windows for their projects.
Established in 1992, CDW Systems aluminium products include windows, bi-folds, sliding patio doors, commercial entrance doors and curtain walling. For more information visit www.cdwsystems.co.uk or call 01452 414853.